Mae'r
peiriant ffrwydro ergyd math bachynyn gyffredinol mae ymddangosiad mwy, ac mae'r broses osod yn gymharol fwy cymhleth nag un offer bach. Peiriant gosod a phrofi cywir yw'r allwedd i sicrhau gweithrediad arferol yr offer diweddarach. Yn achos gweithrediadau cychwynnol di-grefft, mae'n ofynnol i ddefnyddwyr ddilyn cyfarwyddiadau personél perthnasol yn llym neu gyfeirio at y cyfarwyddiadau. Gall gweithrediad anawdurdodedig achosi niwed anadferadwy i'r
peiriant ffrwydro ergyd bachyn. Mae'rshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Mae'r
peiriant ffrwydro ergyd math bachyn is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Mae'rprecautions for the installation and debugging of the relevant components are introduced below.
1. Dyfais ffrwydro ergydion:
Mae'rshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Cludwr teclyn codi a sgriw:
Yn gyntaf, cynhaliwch brawf dim llwyth i wirio a yw'r bwced hoisting a'r llafnau troellog yn rhedeg i'r cyfeiriad cywir, yna tynhau gwregys y teclyn codi i raddau cymedrol o densiwn er mwyn osgoi gwyriad, ac yna cynnal prawf llwyth i wirio y gallu gweithredu a chludo, p'un a oes unrhyw rhyfeddod Sŵn a dirgryniad, gwirio a dileu rhwystrau.
3. Gwahanydd tywod-pill:
Yn gyntaf, gwiriwch a yw symudiad yr hwrdd yn hyblyg, ac yna gwiriwch leoliad cywir y plât gwahanu, yna pan fydd y teclyn codi yn cael ei lwytho a'i ddadfygio, mae mewnlif parhaus o ergydion dur, a gwiriwch a yw'r ergydion dur yn llifo allan ac yn cwympo. pan fydd y llithren yn cael ei rhyddhau